Fast Temperature Change Testing Machine High Low Temperature Test Equipment

Original
price: Negotiable
minimum:
Total supply:
Delivery term: The date of payment from buyers deliver within days
seat: Guangdong
Validity to: Long-term effective
Last update: 2017-11-15 00:53
Browse the number: 500
inquiry
Company Profile
 
 
Product details

Basic Info

·         Model NO.: GTO-225

·         Structure: Desktop

·         Type: Heating Type

·         Warrantly: One Year

·         Certificate: Ce, RoHS, SGS

·         Trademark: Grande

·         Specification: CE, RoHs, ISO

·         HS Code: 9024101000

·         Customized: Customized

·         Material: Stainless Steel

·         Application: School, Hosipital, Lab

·         Name: Fast Temperature Change Chamber

·         OEM/ODM: Acceptable

·         Delivery: 12~15 Working Days

·         Transport Package: Wooden Case or According to The Client′s Request

Origin: Dongguan, China


Standard Fast Temperature Change testing machine 


1. Features:
Reasonable structure, cooling speed quickly.

Import of refrigeration units, the main parts are imported international brands, the whole system is equipped with 

multiple protection devices, to improve reliability.

Clever duct structure, small temperature deviation.

Door with observation window, the test specimen can be easily observed state.

Operation of the system is very simple, very easy installation and maintenance.

2. Fast temperature change chamber standard:
GB10589-89 Technical conditions of high and low temperature test chamber.

GB2423.1-89 Low-temperature test methods.

GB2423.0-89 Test Method for High Temperature.


3. Application:

Fast change rates testing chamber is suitable for testing the changes of instruments,electrical,electronic products,machine and parts under the rapid temperature change or the the gradient conditions, takes advantage of compact, 

modern scroll compressors to bring fast temperature cycling to small form factor. The chamber can cycle temperatures at rates up

 to 15°C/minute without requiring cooling water or liquid nitrogen. 


To demonstrate performance, Grande uses the international standard IEC 60068 3-5 measured at the supply air. Temperature

 cycles are run from hot  to cold extremes, and the middle 80% of the transition is timed to determine performance. Your actual

 cycling results will vary depending on methodology, including the start and end temperatures, and the amount of samples loaded.


Technical parameters:

Model

GTO-225

GTO-306

GTO-408

GTO-800

GTO-1000


Internal Dim.W×H×D(mm)

500×750×600

600×850×600

600×850×800

1000×1000×800

1000×1000×1000


External Dim.W×H×D(mm)

1500×1930×1550

1600×2030×1550

1600×2030×1750

2100×2280×1950

2100×2280×1950


Temp, Range

 -70~+150°C(KS);  -40~+150°C(KL);   +20~+200°C(KR)


Rapid Changes Temp.Range

 -70model:-50~+85°C(KS),-40model:-20~+85°C(KL),+20model:0~+85°C(KR)


Heating & Cooling Rate

3°C/min, 5°C/min, 8°C/min, 10°C/min, 15°C/min linear average or nonlinear average


Performance

Temp. Constancy

±2.0°C


Temp.Uniformity

±1.5°C


Indication Resolution

0.01°C


Material

Exterior

Stainless steel plate+powder Coated


Interior

SUS#304 stainless steel plate


Insulation

PU & Fiberglass wool


Systems

Circulation

Sirocco fan


Heating

Heater;stainless-gang Fin-type heat pipe heat pipe heating mode of air circulation


Cooling

Airtight compressor+evaporator fins+air-cooling condenser


Other Competent

Vacuum glass inspection window, cable port, control status indicator lights,chamber lamp,
  experiment separation shelves(freely adjustable 2pcs)



Power Source(K.W.)

Total0bar [View All]  Related Comments
 
more»Other products

[ Products search ] [ favorites ] [ Tell friends ] [ Print ] [ Close ]